Renovation FAQ: Richardson Memorial Hall
Richardson Memorial Hall, designed in 1907, is located on the St. Charles Avenue side of Tulane's Uptown campus.
FAQs
Click on the topics below to expand the list and see our Frequently Asked Questions.
Project Overview
- Total Project Cost: Up to $32 million (up to $23 million is committed from Tulane University Administration and remainder will be paid for by Tulane School of Architecture (TuSA), which has already raised $6 million as of March 2021)
- Architects: Trapolin Peer Architects
- Design Team: Trapolin Peer Architects and TuSA Administration
- Contractor: Broadmoor LLC Construction (a subsidiary of Boh Bros. Construction Co.)
- Project Eligible for Louisiana State Historic Tax Credits
- LEED Silver designation is the energy efficiency target and baseline
- Scope: Renovation to restore historic Richardson Memorial Hall (45,000 square feet) and additions to the back of the building (15,000 square feet) for code compliance and essential programming
Timeline
- Design Completed: Spring 2022
- Value Engineering: Spring 2022 (currently underway, not finalized)
- Abatement/Selective Demolition Start: March 21, 2022, and will last approximately 190 days
- Construction Start: Spring/Summer 2022
- Construction Completion: Late Fall 2024
- Full Occupancy: Spring 2025
Additional Details
- Enhanced teaching and fabrication spaces, as well as faculty and administrative offices, are needed to accommodate TuSA’s growing student body.
- Fabrication facilities will be located together (analog and digital) and have access to outdoor space for overflow needs.
- Students and faculty will be able to begin site visits for educational purposes in Fall 2022.
- Tulane University is still exploring multiple options to provide food services/dining near Richardson Memorial Hall.
- Challenges, to date, include permitting processes and supply chain delays.
- Partial occupancy is unlikely due to the nature of construction and the disruption, inconveniences to school operations.
RMH Renovation Renderings
Digital renderings of the future RMH building were developed by TuSA student Leah Bohatch and RMH Renovation Co-Curators Sonsoles Vela and Nick LiCausi. The renderings - which show the Thomson Lecture Hall (top left and right), fourth floor studio (bottom left) and adjacent gallery (bottom right) - were developed using the plan drawings from project architects Trapolin-Peer Architects.