Andy Spatz, TSA ’73 sends update on 1900 Greenwood Project

Apr 4, 2016

wareHOUSE(1) 1900 greenwood PROJECT UPDATE 

The finishing phase of the project is in full swing. The first sequence of the PAINTING contractors work is 75% complete. This phase entails surface preparation work, priming, patching and the first finish coat. The TILE contractor has completed their first sequence and return to the job once cabinets (bath vanity and kitchen cabinets) are installed. As with the rest of the trades, they will work from south to north. The DRYWALL contractor has finished their initial phase and returns when we are ready to infill the construction break-thru’s that temporarily link the units. The HVAC contractor is about 50% complete. The furnaces have been set, flue piping installed and much of the exposed ductwork has been hung. The ORNAMENTAL IRON contractor started steel stair/loft rail installation at the beginning of last week and is also well underway.
 
NEXT…PAINTING, HVAC, TILE and ORNAMENTAL IRON continue their rotation. FLOOR finishing (low VOC epoxy over existing concrete first floor) starts at the south end of the project this week. CABINETRY is delivered mid-week followed by CARPENTRY installation. The CONCRETE contractor also starts units 1- 3 entries, exterior ADA ramp and aluminum skin related concrete elements…lotsa stuff.  Photos and Videos Here

 

Tags: 
Alumni
Back to top